Project Highlight
- TOTAL E&P INDONESIE - RBI Structure Service
-
PT WIDE & PIN awarded a contracts worth USD 1.1 millions
by Total E&P Indonesie (COMPANY) for the provision of an
Offshore platform integrity management programme using of all COMPANY Offshore platform
related data and suitable software, which is capable to provide detailed planning and scheduling
of COMPANY Offshore platform inspection using a Risk Based Inspection (RBI)
approach in a contract titled RISK BASE INSPECTION (RBI) STRUCTURE SERVICE FOR YEAR 2015-2018.
The contract is included of the following activity and/or activities for COMPANY:- Develop and Provision of an offshore platform integrity management programme using of all COMPANY offshore platform related data and suitable software, which is capable to provide detail planning and scheduling of COMPANY offshore platform inspection using Risk Base Inspection (RBI) approach.
- Performance of Risk Assessment for all COMPANY offshore platforms, all possible modes of failure, degradation and possible and predicted consequences.
- Provision of Inspection, repair, prevention and monitoring planning based on the above Structural Risk Assessment.
- Provision of resources for competency training of COMPANY PERSONNEL for the purpose of future operation of the offshore platform integrity management programme.
- PT DONGGI SENORO LNG - Provision of Service Agreement for Welding Inspector Supply
-
PT WIDE & PIN awarded a contracts worth USD 882,300 and IDR 1,857,431,800 from January 2014 until now (in progress).
Scope of Work:
To provide personnel with certified Welding Inspector, RT level 2 (SNT Tc-1A), hands on experience in RT activities, RT work supervision and RT film interpretation is highly required.
- TOTAL E&P INDONESIE - Material QA/QC Services
-
PT WIDE & PIN is already implemented 2nd contract period (2010 – 2013)
while the 1st contract period was performed from 2007 to 2010.
The sum of the two contracts worth about USD 7.3 millions.
Recently, the 3rd term contract for years 2014 – 2017 worth USD 6.23 millions is awarded to PT WIDE & PIN.
PT WIDE & PIN provides Material QA/QC Services to support TOTAL Supply Chain Management in providing quality materials to support mainly the drilling campaigns. Sub surface material (casing & tubing, well head & x-trees, and down hole completion equipments) were inspected at manufacturer locations around the world.
- MOBIL CEPU LTD - Banyu Urip Project QA/QC Services
-
In October 2011 PT WIDE & PIN signed a contract worth USD 4.32 millions for QA/QC services for Banyu Urip Project.
This contract is to be implemented 2011 to 2014 for the EPC1, EPC2, EPC3, EPC4 and EPC5 project packages.
The Banyu Urip Project is the initial development in the Cepu Block Contract Area, for which a Production Sharing Contract (PSC) exists between BPMIGAS and Company acting as Operator on behalf of other parties constituting contractor under such PSC. The Banyu Urip Project is located in East Java, consisting of the Central Field Facility (CFF) (which includes the Production Processing Facilities [PPF] and supporting Infrastructure Facilities (IF), export, storage, and offloading facilities. The development is expected to produce sour crude and associated gas from multiple well pads. The crude will be sweetened in a Central Processing Facility (CPF) and sent via onshore and offshore pipelines to a floating storage and offloading vessel located off the north coast of Java near the city of Tuban. Associated gas and water will be re-injected into the reservoir. Additional fresh water will be injected into the reservoir.
- PT PERTAMINA HULU ENERGY (PHE-WMO) - Provision of QA/QC Services and NDT Services
-
PT WIDE & PIN awarded a contracts worth USD 4.6 millions by PHE-WMO for the provision of
QA/QC SERVICES AND NON DESTRUCTIVE TESTING (NDT) SERVICES in a contract titled
PROVISION FOR A CALL OUT FOR QA/QC SERVICES AND NON DESTRUCTIVE TESTING (NDT) SERVICES FOR YEAR 2012-2014.
The contract is included of the services to perform inspection, validation, verification, testing, witnessing and certification for adherence to specifications, industry and international codes and government regulations (MIGAS) for PHE-WMO assets to support the fast track projects of development of numerous new platforms as well as platform in operation.
The services includes provision of high quality QA/QC personnel, NDT services (all standard NDT), and advanced NDT (including automatic UT and phase array).
- PEARL OIL (SEBUKU) LTD - Ruby Field Development
-
PT WIDE & PIN implement FEED verification project with a contract worth USD 916,000 in 8 months period.
The Ruby Field Development consist of three (3) wells with the provision for three (3) future wells to be tied in to the facilities. The facility will be designed for normal flow rate of 105 MMscfd (100 MMscfd sales gas) and peak flow rate of 120MMscfd (115 MMscfd sales gas).
A 14-inch 300 kms multiphase subsea export pipeline connected the production manifold from Process and Quarters Platform (PQP) to KP 300.5 which is near to Total’s Senipah Terminal, with water depth of 20m.
The multiphase fluids from production manifold will then be separated into gas, condensate and water in the three-phase Production Separator. The gas and condensate will be custody-metered and commingled into the export pipeline. Water is metered and sent to the produced water treatment system prior to discharging overboard.
PT WIDE & PIN provided FEED Verification for:- Pipeline
- Topside Facilities (Mechanical ,Instrument, Process & Piping System)
- WHP Structure, PQP Structure and WHP-PQP Bridge
In addition, PT WIDE & PIN performed mill audit at the line pipe and steel manufacturers to ensure quality and mill capability to produce over 25,000 joints of DNV HFW 450 (API 5L X65) line pipes.
- CHEVRON GEOTHERMAL INDONESIA LTD - Unit III Development Project
-
PT WIDE & PIN performed inspection and certification services for CGI with a contract worth about
USD 1 million for Darajat Unit III Project during 2007 – 2009.
The Unit III plant is designed to produce a nominal 121 MW geothermal power. The plant comprises several system units as below to produced 121 MW power:
- Main Steam System
- Non-Condensable Gas Removal System
- Cooling Water System
- Condensate Re-injection
- Auxiliary Cooling Water System
- Component Cooling Water System
- Compressed Air System
- Chemical Feeds System
- Miscellaneous Drains System
- Domestic and Waste Water System
- Gland Steam System
- Lube Oil System
- Fire Water System
- Instrument & Electrical System
Scope of work of the contract is:
- Procurement, Inspection & Expediting
- Inspection during installation, pre-commissioning, commissioning & reliability test
- SLO certification
- CHEVRON GEOTHERMAL INDONESIA LTD - Unit III Development Project
-
PT WIDE & PIN performed inspection and certification services for CGI with a contract worth about
IDR 7 billion for Darajat Unit III Project during 2005 – 2007.
The Unit III plant is designed to produce a nominal 110 MW geothermal power. The plant comprises several system units as below to produced 110 MW power:
- Main Steam System
- Non-Condensable Gas Removal System
- Cooling Water System
- Condensate Re-injection
- Auxiliary Cooling Water System
- Component Cooling Water System
- Compressed Air System
- Chemical Feeds System
- Miscellaneous Drains System
- Domestic and Waste Water System
- Gland Steam System
- Lube Oil System
- Fire Water System
- Instrument & Electrical System
Scope of work of the contract is:
- Procurement, Inspection & Expediting
- Inspection during installation, pre-commissioning, commissioning & reliability test
- SLO certification
- PT SAIPEM INDONESIA
-
PT WIDE & PIN provided QA/QC services in two contracts worth USD 3.6 millions
for the material procurement (structural, mechanical, pressure vessel, electrical equipment,
control system etc.) and to support offshore campaign during installation of platforms and pipelines.
PT WIDE & PIN covered vendor and manufacturing inspection in South East Asia and Far East regions.
The projects are:
BP Berau Ltd. – Tangguh Development Project (2007-2008)
The Project comprised two LNG trains (equipment units that purify and liquefy gas), with the capacity to produce a total of 7.6 million tons per year (mtpa) of LNG. In addition to LNG, the Project is expected to produce condensate at the rate of 9,000 barrels per day (bpd), representing more than 3 million barrels per year. The Project consist of 2 Production Platform YRA and YRB and accompanying pipelines
Premier Oil – Gajah Baru Field Development Project (2010-2011)
The Gajah Baru gas field is located on the West Natuna Block A in the West Natuna Sea, Indonesia. Premier is the operator of the field and holds a 28.67% interest; the other partners in the field are Kufpec (33.33%), Amerada Hess (23%) and Petronas (15%).
Gajah Baru project consist of 2 Platforms CPP and WHB and an export pipeline.